PUBLIC NOTICE - - - NOTICE the Louisiana Department of Conservation and Energy, Office of Permitting and Compliance (OPC) has received the following application(s) for a Coastal Use Permit (CUP) in accordance with La. R.S. 49:214.21 et seq., and the rules of the Coastal Management Program. Applications for coastal use permits may be inspected at 617 North 3rd Street, Room 1078, Baton Rouge, LA or on the OPC webpage at: https://denr.louisiana.gov/page/public-notices . Copies are available, costs apply. Written comments are solicited from the public and must be received within 25 days of the date of this notice. Comments must be uploaded directly to our electronic record through the OPC webpage or mailed to: OPC Administrator, Kyle Balkum, P.O. Box 44487, Baton Rouge, LA 70804-4487. All comments must contain the appropriate CUP number and the commenter's full name and contact information. Below are the referenced application(s): ********* CUP NUMBER: P20260322 Name: Cypress Interstate Pipeline, LLC c/o Morris P Hebert, Inc. 8724 JEFFERSON HWY BATON ROUGE, LA 70809 Attn: Timothy Robertson Location: Calcasieu Parish, LA; Lat. 30-3-41.37N, Long. 93-32-40.53W; Section 36 T12S R14W; Description: Cypress Interstate Pipeline LLC is proposing to install AC Mitigation on the existing 8-Inch Mt. Belvieu to Westlake Pipeline to enhance cathodic protection of the line. The AC Mitigation includes installation of a pedestal and lead connections, test station and pipeline cable, mag anodes, and two deep hole anode wells (see permit drawings). Hydro-vac material generated during excavation and drilling fluids produced from drilling the two wells will be removed from the site using vacuum truck services. Approx. 133 cy of material will be excavated, of which 121 cy will be placed onsite and 12 cy will be hauled offsite. Approximately 12 cy of bentonite grout fill will be used. ********** CUP NUMBER: P20260335 Name: Delta Land Services LLC c/o Delta Land Services, LLC P.O. BOX 1020 PORT ALLEN, LA 70767 Attn: Hunter Shows Location: Calcasieu Parish, LA; Lat. 30-4-19.41N, Long -93-29-33.26W; Section 28 T11S R11W; Sulphur, LA 70665 Description: Re-establishment & rehabilitation of 396.9 ac of fresh/intermediate marsh, re-establishment of 0.6 acres of brackish marsh above the 5’ contour, and enhancement of 23.5 acres of fresh/intermediate marsh and 252.4 acres of brackish marsh within 673.4 acres for purposes of establishing the Goose Lake Coastal Mitigation Bank. Site activities include degradation of spoil banks, backfilling of ditches, removal of culverts and water control structures, and planting of native marsh species. A total of 49,311 cy of material will be excavated and placed onsite. ******************* CUP NUMBER: P20260132 Name: Natural Gas Pipeline Company of America LLC c/o Perennial Environmental Services 13100 NORTHWEST FREEWAY SUITE 150 HOUSTON, TX 77040 Attn: Ryan Conley Location: Cameron Parish, LA; Lat. 29-45-27.4 N, Long. 93-53-3.78 W; Section 13 T15S R16W; Description: Natural is proposing to lower an approximate 5,800-foot segment of its existing 30-inch diameter pipeline beneath the Sabine Neches Waterway in Jefferson County, Texas and Cameron Parish, Louisiana. Approx. 374729 cy of material will be excavated, of which 2291 cy will be placed onsite and 372438 cy will be hauled offsite. 186075-apr 30-1t $42.49