PUBLIC NOTICE - - - NOTICE the Louisiana Department of Conservation and Energy, Office of Permitting and Compliance (OPC) has received the following application(s) for a Coastal Use Permit (CUP) in accordance with La. R.S. 49:214.21 et seq., and the rules of the Coastal Management Program. Applications for coastal use permits may be inspected at 617 North 3rd Street, Room 1078, Baton Rouge, LA or on the OPC webpage at: https://denr.louisiana.gov/page/public-notices . Copies are available, costs apply. Written comments are solicited from the public and must be received within 25 days of the date of this notice. Comments must be uploaded directly to our electronic record through the OPC webpage or mailed to: OPC Administrator, Kyle Balkum, P.O. Box 44487, Baton Rouge, LA 70804-4487. All comments must contain the appropriate CUP number and the commenter's full name and contact information. Below are the referenced application(s): ********************CUP NUMBER: P20260315 Name: Landry, Ross c/o Tim Morton & Associates, Inc. 500 S. Morgan Avenue Broussard, LA 70518 Attn: Joe Morton Location: Iberia Parish, LA; Lat. 29-56-09.00N/Long. -91-58-53.80W; Section 5; T12S R5E; commercial slip off the Delcambre Canal, LA. Description: Proposed maintenance dredging of an existing slip and placement of dredged material on the existing spoil banks and adjacent to the slip. The existing bankline will be cut to accommodate ten (10) boat stalls and a boat ramp. Approximately 764 linear feet of bulkhead will be installed. Approximately 13,162 cubic yards of native material will be excavated and placed on site during construction activities. ************CUP NUMBER: P20260332 Name: Llox, LLC c/o David Wandell 1347 North Causeway Blvd Suite 201 Mandeville, LA 70471 Attn: David Wandell Location: Plaquemines Parish, LA; POB – Lat. 29-06-53N, Long. -89-02-02W and POE – Lat. 29-06-53N, Long. -89-02-02W; Description: Proposed 2-4" flowlines (13,052-ft) from the Hagen Far East Wells A & B to the existing LLOX facility in Southeast Pass. The lines will be jetted 3' below the mudline in open water and 4' below the mudline in Northeast Pass. A portion of the lines will be installed by HDD to avoid marsh impacts. Approx. 4700 CY will be displaced by jetting operations. Approx. 60 CY of sandbags will be used at line crossings. 185702-apr 28-1t $30.63