PUBLIC NOTICE - - - - 3 - SHREVEPORT FIELD 25-404 and 25-405 LEGAL NOTICE STATE OF LOUISIANA, DEPARTMENT OF CONSERVATION AND ENERGY, BATON ROUGE, LOUISIANA. In accordance with the laws of the State of Louisiana, and with particular reference to the provisions of Title 30 of Louisiana Revised Statutes of 1950, a public hearing will be held in the Hearing Room, 1st Floor, LaSalle Building, 617 North 3rd Street, Baton Rouge, Louisiana, at 9:00 a.m. on TUESDAY, OCTOBER 28, 2025, upon the application of APEX NATURAL GAS, LLC. At such hearing the Department of Conservation and Energy will consider evidence relative to the issuance of Orders pertaining to the following matters relating to the Haynesville Zone, Reservoir A, in the Shreveport Field, Caddo Parish, Louisiana. 1. To confirm applicant may drill, designate and utilize five cross unit horizontal wells, one of which to serve as a unit or alternate unit well for HA RA SUV and as an alternate unit well for HA RA SUQ, and the other four cross unit horizontal wells to serve as alternate unit wells for HA RA SUV and HA RA SUQ, with all such wells to be at the at the locations and in the general manner shown on the plat submitted with the application, in exception to the spacing provisions of the 13-L Series of the Department of Conservation and Energy Orders, provided that no portion of the perforated length of lateral in the cross unit horizontal wells should be located closer than 100’ to the south unit boundary of HA RA SUV and 330’ to any east or west unit boundary except for the common unit boundary between said units. 2. To specifically find that the five proposed cross unit horizontal wells for HA RA SUV and HA RA SUQ are reasonable and in the interest of conservation and necessary to efficiently and economically drain a portion of the Haynesville Zone, Reservoir A, underlying said units, which cannot be efficiently and economically drained by any existing well within such units, including the portions of the participating units that are contained within 330’ of either side of the common unit boundary between said units and as to the portion of the south unit boundary of HA RA SUV that is no closer than 100’ from said unit line. 3. To provide that with respect to horizontal wells drilled to the Haynesville Zone, Reservoir A, within or to serve HA RA SUV and HA RA SUQ, where the horizontal portion of the well is cased and cemented back above the top of the Haynesville Zone, Reservoir A, the distance to any unit boundary and any offset well(s) should be calculated based on the distance to the nearest perforation in the well and not based on the penetration point or terminus. 4. To confirm applicant as the operator of HA RA SUV and HA RA SUQ. 5. To provide that unit production from the proposed cross unit horizontal wells should be allocated to each unit in the same proportion as the perforated length of the lateral in each such unit bears to the total length of the perforated lateral, as determined by an “as-drilled” survey performed after such cross unit horizontal wells are drilled and completed. 6. To continue in force and effect, except to the extent contrary herewith, the pertinent provisions of Order No. 13-L, effective April 28, 2009, as amended and supplemented by the 13-L Series of Orders, and all applicable Statewide Orders. 7. To consider such other matters as may be pertinent. The Haynesville Zone, Reservoir A was defined in Order No. 13-L, effective April 28, 2009. A plat is available for inspection in the Department of Conservation and Energy in Baton Rouge and Shreveport, Louisiana. http://dnr.louisiana.gov/conshearings All parties having interest therein shall take notice thereof. BY ORDER OF: DEPARTMENT OF CONSERVATION AND ENERGY Baton Rouge, LA 10/8/25;10/11/25 S lck IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, IF YOU NEED ASSISTANCE, PLEASE CONTACT THE DEPARTMENT OF CONSERVATION AND ENERGY AT P.O. BOX 94275, BATON ROUGE, LA 70804-9275 IN WRITING WITHIN FIVE (5) WORKING DAYS OF THE HEARING DATE. 162192 Oct. 11, 1t $79.07