PUBLIC NOTICE - - - - 2 - GROGAN FIELD 26-151 and 26-152 LEGAL NOTICE STATE OF LOUISIANA, DEPARTMENT OF CONSERVATION AND ENERGY, BATON ROUGE, LOUISIANA. In accordance with the laws of the State of Louisiana, and with particular reference to the provisions of Title 30 of Louisiana Revised Statutes of 1950, a public hearing will be held in the Hearing Room, 1st Floor, LaSalle Building, 617 North 3rd Street, Baton Rouge, Louisiana, at 9:00 a.m. on TUESDAY, MAY 5, 2026, upon the application of EXPAND OPERATING LLC. At such hearing the Department of Conservation and Energy will consider evidence relative to the issuance of Orders pertaining to the following matters relating to the Haynesville Zone, Reservoir A, in the Grogan Field, DeSoto Parish, Louisiana. 1. To authorize Expand to drill, designate and utilize one cross unit horizontal well to serve as the substitute unit well for HA RA SUII and as an alternate unit well for HA RA SUGG and two cross unit horizontal wells to serve as alternate unit wells for HA RA SUII and HA RA SUGG, at the locations and in the general manner shown on the plat submitted with the application; to convert the current unit well for HA RA SUII to an alternate unit well; and to approve an exception to the spacing provisions of Office of Permitting and Compliance Order No. 955-J and to approve these wells in accordance with LAC 43:XIX.4307 et seq. (Statewide Order No. 29-S). 2. To find that the proposed horizontal wells are necessary to efficiently and economically drain a portion of the Haynesville Zone, Reservoir A, underlying the unit or units on which it is proposed to be drilled which cannot be efficiently and economically drained by any existing well on such units(s), will prevent waste, avoid the drilling of unnecessary wells, protect correlative rights and promote the full and efficient development of the natural resources of this state. 3. To provide that if the horizontal portion of a well is cased and cemented back above the top of the Haynesville Zone, Reservoir A, the distance to any unit boundary and offset well(s) will be calculated based on the distance to the nearest perforation in the well and not on the penetration point or terminus of the well. 4. To provide that production from the cross unit wells shall be separated and metered individually and that this information shall be reported in the manner prescribed by the Office of Permitting and Compliance. 5. To provide that the unit allowables for the affected units may be produced from the unit well, from any alternate unit well, or from any combination of such wells serving the unit, at the discretion of the operator. 6. To provide that production from a cross unit horizontal well shall be allocated to each unit penetrated by the well in the same proportion as the perforated length of the lateral in each such unit bears to the total length of the perforated lateral as determined by an “as drilled” survey performed after the well has been drilled and completed. 7. Except insofar as set forth above, to confirm and continue in full force and effect the provisions of Order No. 955-J, effective October 28, 2009, as amended and supplemented by the 955-J Series of Orders; and of all applicable Statewide Orders. 8. To consider such other matters as may be pertinent. The Haynesville Zone, Reservoir A was defined in Order No. 955-J, effective October 28, 2009. A plat is available for inspection in the Department of Conservation and Energy in Baton Rouge and Shreveport, Louisiana. http://dnr.louisiana.gov/conshearings All parties having interest therein shall take notice thereof. BY ORDER OF: DUSTIN H. DAVIDSON, SECRETARY DEPARTMENT OF CONSERVATION AND ENERGY Baton Rouge, LA 4/6/26;4/9/26 S lck IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, IF YOU NEED ASSISTANCE AT THE HEARING, PLEASE CONTACT THE DEPARTMENT OF CONSERVATION AND ENERGY AT P.O. BOX 94275, BATON ROUGE, LA 70804-9275 IN WRITING WITHIN TEN (10) WORKING DAYS OF THE HEARING DATE. 183592 April 9, 1t $79.64