PUBLIC NOTICE - - - - 7- REVISED REDOAK LAKE FIELD 26-98 LEGAL NOTICE STATE OF LOUISIANA, DEPARTMENT OF CONSERVATION AND ENERGY, BATON ROUGE, LOUISIANA. In accordance with the laws of the State of Louisiana, and with particular reference to the provisions of Title 30 of Louisiana Revised Statutes of 1950, a public hearing will be held in the Hearing Room, 1st Floor, LaSalle Building, 617 North 3rd Street, Baton Rouge, Louisiana, at 9:00 a.m. on TUESDAY, MARCH 24, 2026, upon the application of APEX NATURAL GAS, LLC. At such hearing the Department of Conservation and Energy will consider evidence relative to the issuance of Orders pertaining to the following matters relating to the Haynesville Zone, Reservoir A, in the Redoak Lake Field, Red River Parish, Louisiana. 1. To permit Applicant to drill, designate and utilize two horizontal wells, one of which to serve as a unit well and the other to serve as an alternate unit well for HA RA SUX, at the locations and in the general manner shown on the plat submitted with the application, or at any other legal locations within such unit, in exception to the spacing provisions of the 948-C Series of Office of Permitting and Compliance Orders, and in accordance with LAC 43:XIX.4307 et seq. (Statewide Order No. 29-S). 2. To specifically find that the proposed horizontal wells for HA RA SUX are reasonable and in the interest of conservation and necessary to efficiently and economically drain portions of the Haynesville Zone, Reservoir A, underlying said unit, which cannot be efficiently and economically drained by any existing well within such unit. 3. To provide that with respect to horizontal wells drilled to the Haynesville Zone, Reservoir A, within or to serve HA RA SUX, where the horizontal portion of the well is cased and cemented back above the top of the Haynesville Zone, Reservoir A, the distance to any unit boundary and any offset well(s) should be calculated based on the distance to the nearest perforation in the well and not based on the penetration point or terminus. 4. To designate Applicant as the operator of HA RA SUX. 5. To permit the operator of HA RA SUX to produce the unit allowable from either the unit well, any alternate unit well, or from any combination thereof, at its discretion. 6. To continue in force and effect, except to the extent contrary herewith, the pertinent provisions of Order No. 948-C, effective June 2, 2009, as amended and supplemented by the 948-C Series of Orders, and all applicable Statewide Orders. 7. To consider such other matters as may be pertinent. The Haynesville Zone, Reservoir A was defined in Order No. 948-C, effective June 2, 2009. A plat is available for inspection in the Department of Conservation and Energy in Baton Rouge and Shreveport, Louisiana. http://dnr.louisiana.gov/conshearings All parties having interest therein shall take notice thereof. BY ORDER OF: DUSTIN H. DAVIDSON, SECRETARY DEPARTMENT OF CONSERVATION AND ENERGY Baton Rouge, LA 3/3/26;3/9/26 S lck IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, IF YOU NEED ASSISTANCE, PLEASE CONTACT THE DEPARTMENT OF CONSERVATION AND ENERGY AT P.O. BOX 94275, BATON ROUGE, LA 70804-9275 IN WRITING WITHIN FIVE (5) WORKING DAYS OF THE HEARING DATE. 179667 March 9, 1t $70.21