classifieds

  • Baton Rouge
  • Nola.com
  • Acadiana
  • 1-800-960-6397

  1. Home
  2. Public Notices
  3. Baton Rouge
  4. Conservation
  • PLACE AN AD
  • THE ADVOCATE
  • LOG IN
  • SIGN UP

PUBLIC NOTICE - - - - 1 - KINGSTON AND HOLLY FIELDS 25-389 thru 25-391 LEGAL NOTICE STATE OF LOUISIANA, OFFICE OF PERMITTING AND COMPLIANCE, BATON ROUGE, LOUISIANA. In accordance with the laws of the State of Louisiana, and with particular reference to the provisions of Title 30 of Louisiana Revised Statutes of 1950, a public hearing will be held in the Hearing Room, 1st Floor, LaSalle Building, 617 North 3rd Street, Baton Rouge, Louisiana, at 9:00 a.m. on THURSDAY, NOVEMBER 13, 2025, upon the application of EXCO OPERATING COMPANY, LP. At such hearing the Office of Permitting and Compliance will consider evidence relative to the issuance of Orders pertaining to the following matters relating to the Haynesville Zone, Reservoir A, in the Kingston and Holly Fields, DeSoto Parish, Louisiana. 1. To permit the applicant to drill, designate and utilize eight cross unit horizontal wells as alternate unit wells: four for HA RA SUC and HA RA SUH, in the Kingston Field; and four for HA RA SUH, in the Kingston Field, and HA RA SUG, in the Holly Field, at the locations and in the general manner shown on the plat submitted with the application and made a part hereof, in exception to the spacing provisions of the 376-D and 88-J Series of Office of Conservation Orders, and to provide that no portion of the perforated length of lateral in the cross unit wells should be located closer than (a) 330’ to any west or east unit boundary; (b) 100’ to any north or south unit boundary, except or the common unit boundaries between said units; and (c) 200’ to any well in a competitive unit completed in, drilling to, or for which a permit has been granted to drill to the Haynesville Zone, Reservoir A, in the Kingston Field and the Haynesville Zone, Reservoir A, in the Holly Field. 2. To find that the proposed wells are necessary to efficiently and economically drain a portion of the reservoir covered by each unit which cannot be so drained by any existing well within such units. 3. To permit the operator to produce the unit allowable for each unit from the respective unit wells and/or the alternate unit well, in any combination, at its discretion. 4. To find that unit production from the cross unit horizontal alternate unit wells shall be allocated to each unit in the same proportion as the perforated length of the lateral in each unit bears to the total length of the perforated lateral as determined by an “as drilled” survey performed after the cross unit horizontal wells are drilled and completed, provided that unit production shall continue to be shared on a surface acre basis. 5. To provide that production from said cross unit horizontal alternate unit wells shall be separated and metered individually and this information shall be reported in the manner prescribed by the Office of Conservation. 6. To find that, with respect to wells drilled to the Haynesville Zone, Reservoir A, in the Kingston Field, within or to serve HA RA SUC and HA RA SUH, and the Haynesville Zone, Reservoir A, in the Holly Field, within or to serve HA RA SUG, where the horizontal portion of the well is cased and cemented back above the top of the Haynesville Zone, Reservoir A, in the Kingston Field and the Haynesville Zone, Reservoir A, in the Holly Field, the distance to any unit boundary and offset well(s) should be calculated based on the distance to the nearest perforation in the well, and not based on the penetration point or terminus. 7. Except insofar as set forth above, to confirm and continue in effect the provisions of the 376-D and 88-J Series of Orders, the units created thereby and applicable Statewide Orders. 8. To consider such other matters as may be pertinent. The Haynesville Zone, Reservoir A, in the Kingston Field, was defined in Order No. 376-D, effective November 18, 2008. The Haynesville Zone, Reservoir A, in the Holly Field, was defined in Order No. 88-J, effective July 29, 2008. A plat is available for inspection in the Office of Permitting and Compliance in Baton Rouge and Shreveport, Louisiana. http://dnr.louisiana.gov/conshearings All parties having interest therein shall take notice thereof. BY ORDER OF: OFFICE OF PERMITTING AND COMPLIANCE Baton Rouge, LA 10/7/25;10/10/25 S lck IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, IF YOU NEED ASSISTANCE, PLEASE CONTACT THE OFFICE OF PERMITTING AND COMPLAINCE AT P.O. BOX 94275, BATON ROUGE, LA 70804-9275 IN WRITING WITHIN TEN (10) WORKING DAYS OF THE HEARING DATE. 161919-oct 9-1t $84.79

Post Date: 10/10 12:00 AM
Refcode: #534023.1  iPrint
Tweet
iPublish Marketplace powered by iPublish Media Solutions © Copyright 2020